Integrated Project Delivery
Target Value Design (estimating today).pdf
Estimating Today - May2011 - Cathedral Hill Hospital Project-Paper only.pdf
Unit Cost Historical
Work Breakdown Structure
Estimate Structure
Two Way Data Flow Process
AR Model and Design Model
Process-Based Cost Modeling Framework and Case Study Framework and Case Study.pdf
Verification Predictive Analysis Engineering Model (Time Sequence)
Scheduling
Means and Methods
Active Developing Technologies for Design Components
Construction Project/Mission Planning and Design
Lunar Mega Project Processes Work Flow and Terminology.pdf
Other
Cost of an International Lunar Base by Johannes Weppler.pdf
Hassell designs inflatable moon base for the European Space Agency.pdf
Lunar Base Scenario Cost Estimate by NASA from the 1980s (1).pdf