1.jpg

Integrated Project Delivery

2.jpg

Unit Cost Historical

3.jpg

Work Breakdown Structure

NASA Work Breakdown Structure Handbook.pdf

4.jpg

Estimate Structure

NASA Cost Estimating Handbook.pdf

5.jpg

Two Way Data Flow Process

6.jpg

AR Model and Design Model

Visual Workload Leveling and Zoning Using Work Density Method for Construction Process Planning - Vishesh Vikram Singh.pdf

7.jpg

Verification Predictive Analysis Engineering Model (Time Sequence)

Model-Based Systems Engineering, Real-time Operations, and Autonomy by Dr. Fernando Figueroa (NASA).pdf

8.jpg

Scheduling

9.jpg

Means and Methods

Moon to Mars Planetary Autonomous Construction Technologies (MMPACT).pdf

10.jpg

Active Developing Technologies for Design Components

11.jpg

Construction Project/Mission Planning and Design

Lunarbase Construction Planning.pdf

12.jpg

Other

NASA's Cost Estimating and Reporting Practices for Multimission Programs .pdf